Basic Info.
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Apartment, Hospital, Hotel etc
Advantage
Easily Installation, Almost No Welding on Site
Wall and Roof Pane
EPS/PU/Firberglass/Rockwool Sandwich Panel
Door
Sliding Door, Rolling Door etc
Window
PVC or Aluminium Alloy Window
Purlin
C/Z Shape Steel Channel
Surface Treatment
Coated, Lacquered
Grade
High Strength, Light Weight
Floor Deck Board
Galvanized Steel Sheet
Attachments
Rainspout, Metal Decorative Sheet, Ventilator
Structure Usage
50 - 100 Years
Finishing Options
Vast Array of Colors and Textures Available
Transport Package
Standard Export Package
Product Description
1. SpecificationNo | Item | Introduction |
1 | Steel frame | High quality heavy Q235/Q345 Steel structure |
G550 Z275 Galvanized or AZ 150 Galvalume Keel |
2 | Exterior & Interior wall | 75-150 mm Lightweight Cement foam board |
Other Cladding materials |
3 | Roof | 50mm/75mm/100mm sandwich board(with EPS, PU for its interlayer) |
roof truss + color steel sheet / other decoration materials |
75-150 mm Lightweight Cement foam board water-proof |
Roof decoration materials |
Other Cladding materials |
4 | Celling | Gypsum board / Integrated ceiling |
5 | Floor | Ceramic tile, wood floor |
6 | Door | Safty-door, wood door, Titanium magnesium alloy door, etc |
7 | Window | Aluminum alloy, PVC, Broken Bridge Aluminum |
8 | Electrical | Wire, Switch, Socket, ceiling light, Distribution box, etc |
9 | Pipeline | Water supply and drainage pipes |
10 | Kitchen | Cabinet etc |
11 | Bathroom | Toilet, washbasin, shower, etc |
12 | Foundation | Done by buyer |
2. Detailed Description
(1) Features Primary Framing Elements-columns, beams and all primary members are made by H section steels- hot rolled section steel/ welded section steel, which will be bolted together at the site. A factory primer and facing paintings are applied to get the better anti-rusting effect of primary framing elements.
Secondary Framing-Purlin, Tie Bar, Roof, and Wall Support are formed as secondary framing1 - Roofing system: It blocks rain, snow, and wind. Ensure a comfortable and dry working environment in the workshop/warehouse.
2 - Composite floor deck: A two-story or multi-story building, which is poured on the floor slab to serve as a formwork. Save time and improve construction progress.
3 - Hallway system: We can provide various wall partitions of different materials.
4 - Purlin: Support the roof sheeting and the fixed position of the roof sheeting.
5 - Finished metal siding and flashing: Roof and Wall are covering of color-coated corrugated steel sheet or steel sandwich panel, hot dipped with zinc and aluminum compound, that is fixed to the outside of the structural building to protect it against bad weather or to make it look more attractive and last for generations.
6 - Painted Roll - Up doors and filler panels: Easy access. According to customer requirements, there are composite panel doors, electric shutter doors and so on.
7 - Support post: Supporting building.
8 - Load bearing wall assembly with horizontal partitions for shear walls: Supporting building.(2) Drawings Show (3) Advantage Lightness in weight
High strength and stiffness
Ease of Prefabrication and mass production
Fast and easy erection and installation
Substantial elimination of delays due to weather
More accurate detailing
Non-shrinking and non-creeping at ambient temperatures
Termite-proof and rot proof
The economy in transportation and handling
Non-combustibility
Recyclable material (4) ApplicationIndustry: workshop, warehouse, and other industrial facilities.
Commerce: Mall, hotel, exhibition hall, hospital, office building.
Public: the social activity center, school, library, sports stadium, church, etc.
3. Steel Structure Process3.1 Prepare raw materials
Cut steel plate or use customized size H section steel and angle steel, round tube, round steel, square tube, etc.;
3.2 Assembly and welding
Our welders will follow the drawings to assemble the steel members and weld them together as an entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding, this is the first quality check)
3.3 Sandblast
After finish welding and polishing, our sandblast effect can reach 2.5 high grade, very good for resisting rust; (Secondary quality check)
3.4 Paint
Within 2 hours after sandblasting, all the steel members should be painted. A client can choose any color and any brand of paint. (The third quality check)
3.5 Inspect the goods by the client
After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame.
3.6 Packing and loading
If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )
4. Installation Process5. Market
6. Our Service
6.1 Pre-sale Service- Consultant service(Answering client's questions)
- Primary design plan(Free)
- Assisting the client to choose a suitable construction plan
- Price calculation
- Business&technology discussion
6.2 Sale Service- Submission of support reaction data for foundation
- Submission of the construction drawing
- Providing requirements for embedding
- Construction Manual
- Fabrication&Packing
- Delivery
- Other requirements by Clients
6.3 Training for assembly- We can support you full training service of how to construct and assembly on site.
- Solution 1: if you have your own construction team with engineers, plumbers, electricians, and supervisors, we can support you 2 professional technician for the necessary assembly training on-site.
- Solution 2: If you don't have a construction team, we recommend you employ local construction workers for assembly, we can support you all the technician engineer and supervisor for training and construction assist. But the relevant charges will be on your account.
6.4 After-sale Service- Periodical following-up our client's projects
- Feedback and good communication
- 50 years warranty for VISTA steel frame
7. FAQ
7.1 What's the quality assurance you provided and how do you control quality?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in-process materials, validated or tested materials, finished goods, etc.
7.2 Do you offer guiding installation on site overseas for warehouse building?
Yes, we can provide the service of installation, supervision, and training by extra. We can send our professional technical engineer to supervise installation on site overseas. They have succeeded in many countries, such as Iraq, Dubai, South Africa, Algeria, Malawi, Thailand, and Ghana.
7.3 What is your main market?
Guided by global field of vision, our products have been exported to many countries and regions with its good quality and good service, such as France, UAE, South East Asia, Africa and so on. We will be glad to establish sincere business cooperation with you in the near future.
7.4 How to pack the products?
We use a standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
7.5 Can you offer designing service?
Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirements. They use software: Auto CAD, PKPM, MTS, 3D3S, Search, Tekla Structures(X steel)V12.0.etc.
8. Customized design is welcome, it would be better if you could provide the following information:8.1 Location (where will be built?) _____country, area
8.2 Size:Length*width*height _____mm*_____mm*_____mm
8.3 Wind load (max.Wind speed) _____kn/m2, _____km/h, _____m/s
8.4 Snow load (max.Snow height) _____kn/m2, _____mm
8.5 Anti-earthquake _____level
8.6 Brickwall needed or not If yes, 1.2m high or 1.5m high
8.7 Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok.The cost of the latter will be much lower than that of the former.
8.8 Door quantity & size _____units, _____(width)mm*_____(height)mm
8.9 Window quanity & size _____units, _____(width)mm*_____(height)mm
8.10 Crane needed or not If yes, _____units, max.Lifting weight____tons;Max.Lifting height _____m
Welcome to visit our factory, we assure that our products will satisfy your needs with designs, competitive performance price ratio and best services.
Address:
Tongkang, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company, Group Corporation
Business Range:
Agriculture & Food, Construction & Decoration, Service
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Company Introduction:
Founded in 2001, it is located in Shandong Province, China, mainly engaged in the production of steel structures, power towers, light steel villas, container houses, building curtain walls, parking structure and other products. There are 198 employees, including 20 senior engineers, 62 engineers, 5 steel structure graduate students, 3 invention patents and 2 utility model patents. The company is a high-tech enterprise in Shandong Province, a vice chairman unit of the Provincial Steel Structure Association, and a permanent member of the China Building Metal Structure Association.
The company has a production and processing base of 167, 000m² And a production workshop of 32, 000m² . There are 9 main steel s tructure production lines such as light steel, heavy steel, grid and pipe trusses, 6 power tower production lines, and 5 maintenance structure production lines such as color steel plates and curtain walls. The company has an annual production capacity of 20, 000, 000kg steel structure and 30, 000, 000kg iron tower. The company has large-scale CNC cutting machine, pressure bending machine, coiling machine, shearing machine, submerged arc welding machine, CNC hydraulic punching machine and other processing equipment. The mechanization and automation level of production reaches the advanced level in the same industry.
Our strength & brief presentation as below:
1. The Group was founded in 2001, with 167, 000m² Processing base.
2. One of the biggest steel structure manufacturers in China, with annual output 100, 000 tons.
3. Got national steel structure 1st-grade qualification on production, construction, and contract.
4. Got CE, ISO9001, ISO14001, OHSAS18001, SGS, IIW Certification.
5. China national high-tech company, with 62 engineers and 198 staff in total.
6.9 main steel structure production lines
7. Service cover custom design, manufacture, and installation.
8. Got the China National Construction Steel Structure Gold Award for several projects, which is the highest award in these fields.