Basic Info.
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Apartment, Hospital, Hotel etc
Advantage
Easily Installation, Almost No Welding on Site
Wall and Roof Pane
EPS/PU/Firberglass/Rockwool Sandwich Panel
Door
Sliding Door, Rolling Door etc
Window
PVC or Aluminium Alloy Window
Purlin
C/Z Shape Steel Channel
Surface Treatment
Coated, Lacquered
Grade
High Strength, Light Weight
Floor Deck Board
Galvanized Steel Sheet
Attachments
Rainspout, Metal Decorative Sheet, Ventilator
Structure Usage
50 - 100 Years
Finishing Options
Vast Array of Colors and Textures Available
Transport Package
Standard Export Package
Product Description
1. High strength and durability. Unlike wood, steel is not affected by biological processes (e. g., rotting). The service life of light gauge steel framings exceeds 100 years. They can withstand all the features of our climate: temperature changes, precipitation, winds.
2. Fast construction.In contrast to buildings from traditional materials, comfortable villages composed of steel frame houses can be constructed within a month. Frame houses that use prefabricated parts are lightweight, which in most cases eliminates the need for lifting mechanisms.
3. Independence from weather conditions.Customers are not limited by weather conditions in the course of the construction of frame housing using the prefab house.
Due to the absence of wet processes in their construction, the construction team can provide a continuous workflow.
4. Low cost.The final cost of a frame house constructed with the prefab house is lower than that of a house from traditional building materials: bricks, concrete blocks, conventional bricks, etc.
5. High resistance to heat loss.High thermal insulation properties of the building are provided by the fact that, unlike that of the buildings made of brick or wood, the entire thickness of the wall is filled with a highly efficient heat-insulating material, which can significantly reduce the heating costs of the building.
6. Earthquake and fire safety.prefab houses can withstand seismic loads of up to 8.0 on the Richter scale. Mineral wool which is used as an insulation material can be used at a wide range of temperatures (from -60 oC to +400 oC). Thus, the structures do not accumulate moisture, are protected against corrosive acidic environment, high temperatures and fire, and are not susceptible to rodent and microorganism infestation.
7. Eco-friendliness.The steel components of the prefab house can be reused, which is a big environmentally-friendly advantage. This advantage is also actively leveraged by extractive industries in rotational camp construction.
8. No shrinkage.Due to their lightness, prefab houses are not subject to shrinkage observed in the construction of brick and aerated concrete houses.
9. Wide architectural possibilities.Prefab house may cover large bays of up to 20 m without intermediate supports. This allows for the best use of the building's internal space as well as for the re-planning possibilities.
1. Project Details The composite wall panel is made of steel structure, insulation, interior, and exterior veneer by using the adhesive property of polyurethane during the foaming process. With specific connection components, the modules can be easily assembled and construction measures on finishes on reduced to a minimum without noise and dust-intensive works on site. The panel package dramatically saved transportation volume. VISTA - Specifications of Prefab House |
No | Item | Introduction |
1 | Steel frame | High quality heavy Q235/Q345 Steel structure |
G550 Z275 Galvanized or AZ 150 Galvalume Keel |
2 | Exterior & Interior wall | 75-150 mm Lightweight sandwich panel or fiber cement board |
Other Cladding materials |
3 | Roof | 50mm/75mm/100mm sandwich panel (with EPS, PU for its interlayer) or fiber cement board |
roof truss + color steel sheet / other decoration materials |
75-150 mm Lightweight sandwich panel or fiber cement board water-proof |
Roof decoration materials |
Other Cladding materials |
4 | Celling | Gypsum board / Integrated ceiling |
5 | Floor | Ceramic tile, wood floor |
6 | Door | Safty-door, wood door, Titanium magnesium alloy door, etc |
7 | Window | Aluminum alloy, PVC, Broken Bridge Aluminum |
8 | Electrical | Wire, Switch, Socket, ceiling light, Distribution box, etc |
9 | Pipeline | Water supply and drainage pipes |
10 | Kitchen | Cabinet etc |
11 | Bathroom | Toilet, washbasin, shower, etc |
12 | Foundation | Done by buyer |
4. Our Service
4.1 Pre-sale Service- Consultant service(Answering client's questions)
- Primary design plan(Free)
- Assisting the client to choose a suitable construction plan
- Price calculation
- Business&technology discussion
4.2 Sale Service- Submission of support reaction data for foundation
- Submission of the construction drawing
- Providing requirements for embedding
- Construction Manual
- Fabrication&Packing
- Delivery
- Other requirements by Clients
4.3 Training for assembly- We can support you full training service of how to construct and assembly on site.
- Solution 1: if you have your own construction team with engineers, plumbers, electricians, and supervisors, we can support you 2 professional technician for the necessary assembly training on-site.
- Solution 2: If you don't have a construction team, we recommend you employ local construction workers for assembly, we can support you all the technician engineer and supervisor for training and construction assist. But the relevant charges will be on your account.
5. FAQ
5.1 What's the quality assurance you provided and how do you control quality?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in-process materials, validated or tested materials, finished goods, etc.
5.2 Do you offer guiding installation on site overseas for warehouse building?
Yes, we can provide the service of installation, supervision, and training by extra. We can send our professional technical engineer to supervise installation on site overseas. They have succeeded in many countries, such as Iraq, Dubai, South Africa, Algeria, Malawi, Thailand, and Ghana.
5.3 What is your main market?
Guided by the global field of vision, our products have been exported to many countries and regions with its good quality and good service, such as France, UAE, South East Asia, Africa and so on. We will be glad to establish sincere business cooperation with you in the near future.
5.4 How to pack the products?
We use a standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5.5 Can you offer designing service?
Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirements. They use software: Auto CAD, PKPM, MTS, 3D3S, Search, Tekla Structures(X steel)V12.0.etc.
5.6 How To Progress a Prefab House/Container House Order?
Step 1 | Customer Select standard designs or sends detail design ( Layout with size, Appearance, etc) together with tech data |
Step 2 | Customized Solution with Quotation would be sent based on request |
Step 3 | Negotiate and confirm each detail of goods, trading terms and so on, get agreement and sign contract. |
Step 4 | Advanced payment and arrange production, to confirm the delivery time with the customer |
Step 5 | Factory Examine Goods/ rectify and reform to meet the requirements of the contract. |
Step 6 | Balance payment and shipping in time |
Step 7 | Handing Shipping files to help clients get goods from the transporter in time. |
Step 8 | A customer prepares to do foundation work after receiving foundation information |
Step 9 | The customer gets goods and on-site construction would send an engineer to help to install and train labors as request and go into warranty time |
6. Customized design is welcome, it would be better if you could provide the following information:6.1 Location (where will be built?) _____country, area
6.2 Size: Length*width*height _____mm*_____mm*_____mm, And Quantity: _____ units
6.3 Wind load (max.Wind speed) _____kn/m2, _____km/h, _____m/s
6.4 Snow load (max.Snow height) _____kn/m2, _____mm
6.5 Anti-earthquake _____level
6.6 Thermal insulation If yes, EPS, fiberglass wool, Rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
6.7 Door quantity & size _____units, _____(width)mm*_____(height)mm
6.8 Window quantity & size _____units, _____(width)mm*_____(height)mmWelcome to visit our factory, we assure that our products will satisfy your needs with designs, competitive performance price ratio and best services.7. WE ARE HERE
Address:
Tongkang, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company, Group Corporation
Business Range:
Agriculture & Food, Construction & Decoration, Service
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Company Introduction:
Founded in 2001, it is located in Shandong Province, China, mainly engaged in the production of steel structures, power towers, light steel villas, container houses, building curtain walls, parking structure and other products. There are 198 employees, including 20 senior engineers, 62 engineers, 5 steel structure graduate students, 3 invention patents and 2 utility model patents. The company is a high-tech enterprise in Shandong Province, a vice chairman unit of the Provincial Steel Structure Association, and a permanent member of the China Building Metal Structure Association.
The company has a production and processing base of 167, 000m² And a production workshop of 32, 000m² . There are 9 main steel s tructure production lines such as light steel, heavy steel, grid and pipe trusses, 6 power tower production lines, and 5 maintenance structure production lines such as color steel plates and curtain walls. The company has an annual production capacity of 20, 000, 000kg steel structure and 30, 000, 000kg iron tower. The company has large-scale CNC cutting machine, pressure bending machine, coiling machine, shearing machine, submerged arc welding machine, CNC hydraulic punching machine and other processing equipment. The mechanization and automation level of production reaches the advanced level in the same industry.
Our strength & brief presentation as below:
1. The Group was founded in 2001, with 167, 000m² Processing base.
2. One of the biggest steel structure manufacturers in China, with annual output 100, 000 tons.
3. Got national steel structure 1st-grade qualification on production, construction, and contract.
4. Got CE, ISO9001, ISO14001, OHSAS18001, SGS, IIW Certification.
5. China national high-tech company, with 62 engineers and 198 staff in total.
6.9 main steel structure production lines
7. Service cover custom design, manufacture, and installation.
8. Got the China National Construction Steel Structure Gold Award for several projects, which is the highest award in these fields.